| 1. | Brief on management and maintenance of modern fire facilities 浅谈现代消防设施管理与维护保养措施 |
| 2. | Public city fire facility 城镇公共消防设施 |
| 3. | The current status and countermeasures of urban fire facilities in baoan district , shenzhen city 深圳市宝安区城市公共消防设施的现状及对策 |
| 4. | A major cost - saving measure was also achieved by reducing fuel costs substantially with the coal - fired facility commencing operation since december 2001 集团自二零零一年十二月开始采用燃煤热电生产设施后,大大减低了燃料开支,成功将生产成本显著减省。 |
| 5. | A major cost - saving measure was also achieved by reducing fuel costs substantially with the coal - fired facility commencing operation since december 2001 集团自二零零一年十二月开始采用燃煤热电生产设施后,大大减低了燃料开支,成功将生产成本显著减省。 |
| 6. | To cater for future expansion of production lines , our second coal - fired facility in the xinhui premises will be completed in july 2004 to double our power output 为应付生产线的扩充,新会厂房的第二期燃煤发电设施将于二零零四年七月完成,届时发电量将增加两倍。 |
| 7. | To cater for future expansion of production lines , our second coal - fired facility in the xinhui premises will be completed in july 2004 to double our power output 为应付生产线的扩充,新会厂房的第二期燃煤发电设施将于二零零四年七月完成,届时发电量将增加两倍。 |
| 8. | Close to the end of 2001 , the construction work of the coal - fired facility for producing steam and electricity was completed , indicating that a major cost - saving measure was achieved 于二零零一年底前,本集团之燃煤热电生产设施竣工及投产,成功实践一项主要节省成本之措施。 |
| 9. | Close to the end of 2001 , the construction work of the coal - fired facility for producing steam and electricity was completed , indicating that a major cost - saving measure was achieved 于二零零一年底前,本集团之燃煤热电生产设施竣工及投产,成功实践一项主要节省成本之措施。 |
| 10. | The new coal - fired facility , with an output more than doubling the existing one , not only helped stabilize power supply for production plants but also further reduce fuel costs 新的燃煤热电设施发电量为原有设施之两倍多,不但为厂房提供稳定的电力供应,同时亦进一步减省燃料成本。 |